 Drilling of 66 per 10 meters and
20 per 5 meters pile foundations
|

|
 Filling up the pile hole
with 5 m³ of concrete each
|
 Foundation excavation from 750 m³ of soil |

|

|

|
 Installation of 40 t foundation |
 First phase:
The first delivery of 40 concrete mixers in total.
|

|
 Calibration for the correct positioning of the anchoring. |

|