Startseite Richter Maschinenfabrik AGSeite Steel tubbings zu den Favoriten hinzufügenSeite weiter empfehlenSeite drucken

Steel tubbings for tunnel project Russia

As in other cities throughout the world, in Moscow road traffic is constantly on the increase. Consequently, two tunnel tubes are to be constructed for the 3rd motorway ring using trenchless tunnelling methods. Richter Maschinenfabrik AG supplies steel tubbings which are constructed to form complete rings, directly following the tunnel drilling process, protected by the shield. Each steel tubbing, weighing 118,640 kg, is transported to Moscow in 8 HGVs.


Loading a steel tubbing
Loading a steel tubbing
Ring
Ring completely assembled from eight steel tubbings.
Weight 118.640 kg
exterior 13.750 mm, interior
13.750 mm x width 2.030 mm
8 HGVs
8 HGVs for transporting one complete ring, consisting of eight steel tubbings
Cutting wheel
Cutting wheel S-208
Dim.: 7.770 x 1.375 mm
Weight: 74.700 kg
Cutting wheel
Cutting wheel S-208
Side view
 

Updated: 28.11.2011