 Heavy goods transport! Total vehicle weight: 417 t - Length: 50 m |
 Bottom section of a pipeline pipe press Dimensions:. 16.5 x 4.3 x 3.8 m - Weight: 250 t |
 Centipede... Two days later the 2nd component starts its journey too.
|
 Wheel mania Four double tyres per axle (24 axles) (total number of wheels: 192) on the trailer. |
 Night work At night, when the roads are empty, they are still too narrow. Here the pavement has to be used too. |
 Temporary storage The first part is waiting in Gimte on the River Weser for transport by water on a pontoon. |
 Roll-in onto the pontoon The heavy goods trailer is pushed onto the pontoon, centimetre by centimetre. |
 Nearly in position After the trailer has been positioned it is lowered. This prevents rocking when breaking waves hit. |
 The journey continues The barge sets off downstream in the direction of Rotterdam. |
 Course of the River Weser The ramp and trailer are lashed down well. Pioneer trip more than 100 m long to Bad Karlshafen. A pilot helped with the navigation. |
 Bad Karlshafen on the River Weser Arrival in Bad Karlshafen for further loading to the seaport of Rotterdam. |
 Pause This lifting gear was used to temporarily store the top section for a while. After the bottom section had also arrived the journey continued by inland waterway vessel to Rotterdam, the end of this stage of the trip. |